Launched both Lockbox and Notes on the Test Pilot platform, 2018-07-10.
-
Biggest referrer on launch day was the story on blog.mozilla.org.
-
Made metrics updates and pushed a release to stage 2018-07-12.
-
Planning for the second half of 2018 in progress.
-
Released a Screenshots update the week of 2018-07-26: three new annotation tools.
Cloud Storage
-
Shield Study: launched 2018-06-28.
-
End date for the study was 2018-07-16. It is self-expiring and users are being unenrolled.
-
Initial findings were presented 2018-07-23.
-
8800 respondents
-
97% response rate
-
Google Drive, then Dropbox, then Microsoft One Drive, then iCloud.
Color
-
Continuing to work on custom backgrounds in Color, just got drag & drop working.
-
Working on addressing performance issues; one significant bug was identified.
-
Working through new designs and use cases so this can eventually replace Personas Plus.
-
Red-lined design spec is being completed.
-
Small bugs being squashed.
Email Tabs
- Working on acceptance criteria and experiment definition.
Lockbox
-
Expanded release to en global (was en_US) on 2018-07-18.
-
Work will begin on the Android app at the end of July.
Notes
-
Notes team has switched to the new Firefox Accounts Android component for authentication.
-
QA has started testing this change.
-
Feedback from surveys rolling in: checklists are most requested feature.
Send
-
Backgrounds and file toasts are in place.
-
iOS prototype is working; needs UI cleanup still writing the plumbing pieces to get the webpack js bundle into the right place automatically when building the xcode project,
-
Up next: work on the equivalent of intents.
-
Multi-file support is working; new tests being added.
-
Close to pushing the new UI.
-
Updated Android APK is available.
-
Merging service workers into v next.
Side View
-
~6500 users.
-
Led to ~12k more Test Pilot installs.
-
20K referrals from a snippet that pointed to the Mozilla blog that was posted 2018-07-10.
-
Working to get Side View into Shield; PHD written and submitted for review.
TBD
-
Team is working on a new concept, based on the discussions in the Monthly MoCo meeting.
-
Preliminary max/diff surveys are in design.
-
Next steps/milestone are identified.
-