TL;DR: all GREEN.
Test Pilot
-
Pushed a release to production 2018-08-01.
-
Included updated translations.
-
Several metrics bugs squashed.
-
Q3 OKRs are being proposed and refined.
Cloud Storage
-
Shield Study: launched 2018-06-28.
-
End date for the study was 2018-07-16. It is self-expiring and users are being unenrolled.
-
Preliminary findings were presented 2018-07-23.
-
8800 respondents
-
97% response rate
-
Google Drive, then Dropbox, then Microsoft One Drive, then iCloud.
-
Final report expected 2018-08-03.
-
Determining next steps for this project.
Color
-
Continuing to work on custom backgrounds in Color, just got drag & drop working.
-
Adding pagination to pre-set themes.
-
Working on addressing performance issues; one significant bug was identified.
-
Working through new designs and use cases so this can eventually replace Personas Plus.
-
Red-lined design spec is being completed.
-
Dashboard for up-to-date metrics is live.
Email Tabs
-
Designs are still being iterated through.
-
Metrics spec’d out, need to be implemented.
-
Open questions about email templates (how to design, what types to include).
-
Possible end of summer release; reviewing schedules and dependencies.
Lockbox
-
Work kicked off on the Android app this week.
-
iOS retrospective scheduled for mid-August.
Notes
-
Google Play store shows over 10K installs.
-
Feedback from surveys rolling in: checklists are most requested feature. Updated stats as of 2018-07-30:
Send
-
iOS prototype status: fully working, including sending files using the share panel.
-
Split mobile UI spec into separate tickets so work can get started: 13 issues in Android project.
-
Focus is on Android, iOS lower priority (no change, just calling it out).
-
Close to pushing the new browser UI; it’s up on the Send2 dev server. Looking really good.
-
Proposed beta release mid-September when 63 is in beta.
Side View
-
~6500 users.
-
Led to ~12k+ more Test Pilot installs.
-
20K+ referrals from a snippet that pointed to the Mozilla blog that was posted 2018-07-10.
-
Working to get Side View into Shield; PHD written and submitted for review.
-
Tentatively scheduled for Shield review 2018-08-08.
-
Engineering work (metrics, onboarding) anticipated for Shield study.
TBD
-
Team is working on a new concept, based on the discussions in the monthly MoCo meeting.
-
Preliminary max/diff survey is almost live.
-
Beginning discussions with outside teams to discuss overlap, plans, etc.